LIGHTNING PROTECTION CHECKLIST
P.G. Sreejith, Manager, Cholamandalam AXA Risk Services Ltd., Chennai, INDIA
|
Sl. No. |
LP Check Point |
Comments |
|
|
Name of structure / building /block |
|
|
|
To-scale plan and elevation drawing of the block / structure / building |
|
|
|
Dimensions of the block / structure / building (for a complex structure, make a small sketch & mark the dimensions) |
|
|
|
Type of construction (Roof, walls, metal chimney- continuity issues) |
|
|
|
Names of chemicals stored / Processed (flammability, corrosion aspects) |
|
|
|
Material of air terminal |
|
|
|
Material of down conductor |
|
|
|
Physical condition of air terminal |
|
|
|
Physical condition of down conductor |
|
|
|
Condition and Number of earth connections |
|
|
|
Diameter & storage capacity of tanks (if applicable) |
|
|
|
Type of storage tank (fixed roof / fixed-cum floating, floating) |
|
|
|
Routing of down conductor (side flash issues) |
|
|
|
Presence of test link |
|
|
|
One test link for each down conductor? |
|
|
|
Equipment / vessel/ structure earthing details |
|
|
|
Height of the air terminal from the ground |
|
|
|
Surge protection (field instrumentation, DCS I/O racks, IT room, tele-communication equipment, etc.) |
|
|
|
Location of air terminal (mark on the plan / elevation drawing) |
|
|
|
Open areas -details |
|
|
|
Present lightning protection maintenance details |
|
|
|
Details of lightning / surge accidents |
|
|
LP RISK ASSESSMENT FACTORS (IS 2309/ BS 6651) |
||
|
|
Use of structure |
|
|
|
Type of construction |
|
|
|
Contents or consequential effects |
|
|
|
Degree of Isolation |
|
|
|
Type of country |
|
|
|
Number of thunderstorm days |
|
|
|
Dimensions of the structure (LxWxH) |
|
|
|
Type of roof (flat, ridge, etc.) |
|
|
|
Overall multiplying factor |
|
|
|
Overall risk factor |
|
|
|
Lightning Protection requirement |
|
Submitted by:
P.G. Sreejith,
Mail to: pillai_sreejith@hotmail.com
Manager,
Cholamandalam AXA Risk Services Ltd.
2/25/04